I have a dual AIO system (with PV).
I’m on the Octopus Agile tariff and have integrated with Wonder Watt (meter serial number successfully pulled via the API).
The first charge instruction from Wonder Watt on 24-Aug appeared to work (the battery imported from the grid), and the battery was charged. However, since then, the Wonder Watt charge instructions are no longer working and I’ve had to resort to manually setting the charge schedule.
Here is an example of one of the Wonder Watt charge commands that didn’t result in a charge:
2024-08-25 05:58:41 6 % Charge instruction set to 100% for 06:00 - 06:30 - Agile Octopus
Some questions to help with this:
- Should the charge instruction API calls from Wonder Watt appear in the AIO inverter Remote Control History log? I’m not seeing anything logged for Wonder Watt (are API calls logged in a different location?)
- What would prevent the the charge instruction from successfully being set in the inverter?
- I assume if this worked correctly, the charge instructions would appear in the inverter’s charge schedule on the remote control screen?
- Has anyone successfully got Wonder Watt working with a dual battery AIO system?